One HR platform for construction, from the site to head office
Sites open and close, crews move from project to project, and timesheets often live on paper. Teamso records clock-ins with a QR code and geofence on site, gets timesheets and overtime ready for payroll, and keeps training records and assigned equipment in each employee's file.
Paper timesheets reaching head office late and incomplete
Losing track of who works where as crews move between sites
Subcontractor workers and your own staff mixed up in site attendance
Safety training and certificates scattered across separate files
Overtime near handover deadlines going unrecorded
No clear view of who holds which device, tool or vehicle
Where Teamso makes a difference in construction
QR and location attendance on site
Create a separate QR code for each site and gate, and use a printed code where you can't mount a screen. Scans are accepted only inside the geofence you define, with no terminal or card reader to install.
A QR code per site and gate
Geofence check with GPS accuracy margin
Manual records feed timesheets the same way
No biometric data
Timesheets and overtime
Clock-ins flow into timesheets automatically, and any gap between plan and actual shows up as a discrepancy. Record overtime during handover crunches through request and approval, and tag it to a project if you like.
Approve plan versus actual gaps in one click
Overtime tagged to a project or customer
Overtime approval flow by department
Periods lock once payroll closes
Employee records and safety training
Keep each worker's contract, documents and training records in their file. Add reminder dates to training records and see everyone with missing information on a single list.
Reminder dates for training and contract end
A missing data card, person by person
Bulk employee and position upload via Excel
Sites set up as branches
Document approval and e-documents
Publish safety instructions and site rules as policies and see who has read each version. Send documents that need a signature as e-documents, approved by the employee with an SMS code.
Versioned policies under health and safety
Acknowledgements stored with date, time and IP
SMS approval for time-stamped documents
Automatic reminders for late approvals
Asset, equipment and vehicle tracking
Register measuring devices, radios and power tools with serial numbers, and assign them with a handover photo. Assign company vehicles with a mileage reading and keep registration and insurance documents on the vehicle record.
Digital handover form with SMS approval
Assigned, in repair, faulty or lost status
Vehicle assignment by mileage
No deactivation while assets are still assigned
Payroll and SGK
Use a separate SGK workplace profile for each site and handle hires and exits right next to payroll. Preview payroll before closing the period, fix missing data, then close.
Separate SGK profiles for multiple workplaces
Payroll preview without closing the period
Meal and transport prorated for mid-month starts
Combined withholding and premium return package
Recommended modules
Key modules for Construction
Modules that fit how this industry works; each one has its own page with the details.